|
Grand Canyon, AZ– Pipe installation
of the Grand Canyon North Rim waterline will result in the closure of the
Lodge entry road by the Grand Canyon North Rim Visitor Center Sept. 3 to 26,
2019. Expect commercial traffic detours to the Grand Canyon North Rim Lodge
and decreased parking opportunities.
Detours will be clearly marked and
flagmen will be present to direct traffic during the daily work hours of 8
a.m. to 6 p.m.
All traffic will need to use the
Lodge and Visitor Center Parking Lot. Grand Canyon North Rim Lodge will
provide porter assistance for luggage.
Directions will be provided at the
entrance station for commercial and oversize vehicles. A commercial vehicle
drop-off zone will be established in the Lodge Parking Lot. Bus and oversize
vehicle parking are available at the employee dining room area and campground
parking lots.
Picnic areas along the east side of
Highway 67, and the scenic roads to Point Imperial and Cape Royal will also
be open and available for visitor use.
This project consists of the
installation of 16,000 lineal feet of various sized main and lateral water
lines as well as 60 service connections to North Rim facilities. This is the
second phase of a multiphase water utility improvement project on the North
Rim and will continue through the end of 2019 North Rim operating season and
will resume again on May 15, 2020.
|