County road work continues
Share

MOHAVE COUNTY – The citizens of Mohave County can expect the following road maintenance activity during the week of August 3:
Arizona Strip: Road grading on Antelope Valley Rd.
Kingman: Road grading on 1) Calle Lucero and 2) Calle Chavez. Crews will be crack sealing on Thompson Ave. They will be repairing the right of way and repairing pot holes in the Butler area.
Hackberry: Road grading on Antares Rd. from Mile 22 working south.
Wickieup: Road grading on Signal Rd.
Yucca: Road grading on 1) Alamo Rd. from Mile 26 to Mile 40, 2) Chicken Springs Rd., 3) Butch Cassidy Rd., 4) Charlotte Dr. and 5) Juniper Dr.
Hualapai Mtn. Area: Road grading on Silver Springs Rd.
Golden Valley: Road grading on S: 1) Garnet Rd. from Navajo Dr. to Shinarump Dr. and 2) Navajo Dr. from Garnet Rd. to Gold Road Trl. SE: 1) Santa Maria Rd. from Redwall Dr. to Collins Dr., 2) Tonto Rd. from Santa Maria Rd. to Abrigo Dr. and 3) Collins Dr. from Verde Rd. to Santa Maria Rd. SW: 1) Tapeats Dr. from Estrella Rd. to Concho Rd. 2) Unkar Dr. from Estrella Rd. to end of maintenance and 3) Bolsa Dr. from
Estrella Rd. to Laguna Rd. NE: 1) Agua Fria Dr. from Teddy Roosevelt Rd. to Laguna Rd., 2) Agua Fria Dr. from Estrella Rd. to Laguna Rd. and 3) Canelo Rd. from Agua Fria Dr. to Simon Dr. NW: 1) Jurassic Dr. from Estrella Rd. to Air Ranch and 2) Egar Rd. from Agua Fria Dr. to Chinle Dr.
Dolan Springs: Road grading on 1) Seventh St. from Hwy 93 to Joseph Rd., 2) Leonard Dr. from Lunado Dr. to Silver Eagle Dr., 3) Lunado Dr. from Indian Peak Dr. to Leonard Dr., 4) Ocotilla Rd. from Pierce Ferry Rd. to Twentyfirst St., 5) Eighteenth St. from Ocotilla Rd. to North Dr. and 6) Seventeenth St. from Pierce Ferry Rd. to Kitmit Dr.
Meadview: Road grading on 1) Crescent Dr., 2) Boathouse Dr. and 3) Detrital Dr.
Mohave Valley: Fixing drainage on Boundary Cone Rd. Mowing road shoulders in the Lagoon Estates area. Repairing pot holes in the Bermuda Dunes area. Also, they will be street sweeping in the Emerald River area of Ft. Mohave.
Lake Havasu: Pulling road shoulders in the Crystal Beach area.
Heavy Road Maintenance Projects:
Pierce Ferry Rd. Widening — July 2020 through November 5, 2020 — Paving eastbound widened section and non-motorized trail to Mt. Tipton School.
Vanderslice Rd. / From the MCSO substation for one mile north (North of Reservation Rd.) — June 8 through August 16 — CEMEX: One mile of concrete pavement.
El Rodeo Rd. / Hwy 95 to Mountain View Rd. and Mountain View Rd. / El Rodeo Rd. to Joy Ln. — September 8 through 11 — Cactus Asphalt: Placing rubberized chip seal.