County roadwork continues
Share

MOHAVE COUNTY – The citizens of Mohave County can expect the following road maintenance activity during the week of March 1, 2021:
Arizona Strip: Road grading on (1) Antelope Valley Rd. and (2) Mud Mountain Rd. Kingman: Road grading on (1) Jane Ave., (2) Parker St., (3) Ruthe Ave. and (4) Quail Crest Rd. Crews will be repairing pot holes and making right of way repairs in the Butler area.
Valle Vista: Crews will be repairing pot holes in the Valle Vista area. Also, they will be repairing road shoulders on Brooks Blvd. Hackberry: Road grading on (1) Bridge Canyon Dr., (2) Hualapai Ave., (3) Sumac Rd., (4) Yucca St., (5) Joshua St., (6) Manzanita St., (7) Cherokee Ave., (8) Sun Dance Dr., (9) Apache Ave. and (10) Spring Valley Dr.
Wikieup: Road grading on Burro Creek Crossing Rd. Hualapai Mtn. Area: Road grading on Silver Springs Rd. Crews will be crack sealing on Blake Ranch Rd.
Yucca: Road grading on (1) Highland Rd., (2) Chicken Springs Rd., (3) Santa Fe Ranch Rd. and (4) Butch Cassidy Rd. Crews will be repairing pot holes in the Yucca area.
Golden Valley: Road grading on SE: (1) Teddy Roosevelt Rd. from Shipp Dr. to Shinarump Dr., (2) Abrigo Dr. from Teddy Roosevelt Rd. to Hoover Rd. and (3) Hoover Rd. from Abrigo Dr. to Shipp Dr. S: (1) Chemehuevi Dr. from Jade Rd. to Epidote Rd. and (2) Volcanic Dr. from Garnet Rd. to Topaz Rd. NE: (1) Higley Rd. from Hwy. 68 to Chino Dr. and (2) Heber Rd. from Hwy. 68 to Chino Dr. NW: (1) Cowlic Rd. from Mancos Dr. to McElmo Dr. and (2) Cove Rd. from Mancos Dr. to end of maintenance. Pulling road shoulders on Egar Rd. from Hwy. 68 to Shinarump Dr. and crack sealing on Oatman Hwy. from Mile 34 to Mile 40.
Dolan Springs: Road grading on (1) Nineteenth St. from Pierce Ferry Rd. to Laurel Rd., (2) Nineteenth St. from Pierce Ferry Rd. to Olive Dr. and (3) Pellet Dr. from Nineteenth St. to Twentyfirst St. White Hills: Pulling road shoulders on White Hills Rd. from Hwy. 93 to end of maintenance.
Meadview: Crews will be preparing the existing roadbed for planned stabilization and hardsurfacing on Separation Dr. from Meriwitica Dr. to Basin Dr.
Mohave Valley: Street sweeping in Desert Lakes Estates area of Fort Mohave. Also, crews will be preparing the existing roadbed for planned stabilization and hardsurfacing on (1) Torrance Rd., (2) Gardena Rd., (3) Hammer Rd., (4) Lakewood Rd. and (5) Huntington Rd. in Fort Mohave.
Heavy Road Maintenance Projects: ¨ Estrella Rd. / Road closure on Estrella Rd. from Abrigo Dr. to Bolsa Dr.— March 1, 2021 to March 26, 2021— For placement of standpipe
