The citizens of Mohave County can expect the following road maintenance activity during the week of November 2:
Kingman: Pulling road shoulders on Calle Castano. Also, crews will be crack sealing on (1) Northern Ave., (2) Castle Rock Rd. and in the (3) Ranch at Long Mountain area.
Hackberry: Road grading on Hackberry Rd.
Hualapai Mtn. Area: Road grading on Old Hwy. 93.
Yucca: Road grading on (1) Loves Camp Rd. (2) Alamo Rd. from Mile 7 south, (3) Juniper Dr., (4) Gene Autry Rd., (5) Roy Rodgers Rd., (6) Mesquite Dr. and (7) Daytona Dr. Also, crews will be repairing pot holes and clearing drivers’ line of sight in the Yucca area.
Golden Valley: Road grading on SE: (1) Bolsa Dr. from Bacobi Rd. to end of maintenance, (2) Hunt Rd. from Hwy. 68 to Shipp Dr. and (3) Houck Rd. from Hwy. 68 to Collins Dr. S: (1) Sacramento Rd. from Yucca Dr. to Oatman Hwy., (2) Indian Wells Rd. from Ronda Dr. to Sinola Dr. and (3) Bali Hi Dr. from Indian Wells Rd. to end of maintenance. SW: (1) Shinarump Dr. from Guthrie Rd. to Egar Rd., (2) Guthrie Rd. from Shinarump Dr. to end ofmaintenance and (3) Jade Rd. from Shinarump Dr. to Cerbat Dr. NE: (1) Kelvin Rd. from Hwy. 68 to Chino Dr., (2) Kayenta Rd. from Chino Dr. to endof maintenance, (3) Kayenta Dr. from Hwy. 68 to end of maintenance, (4) Mazatzal Dr. from Kelvin Rd. to Tooman Rd., (5) Hermit Dr. from Hwy. 93 toGlen Canyon and (6) Colorado Rd. from Hermit Dr. to Hwy. 93.
Dolan Springs: Road grading on (1) Edgemont Rd. from Pierce Ferry Rd. to end of maintenance, (2) Ninth St. from Pierce Ferry Rd. to Edgemont Rd., (3) Havasu Rd. from Pierce Ferry Rd. to Fifth St., (4) Ruby from Twentyfirst St. to Twentythird St., (5) Twentythird St. from Pierce Ferry Rd. to Telegraph Dr. and (6) Twentysecond St. from Pierce Ferry Rd. to Ruby Rd.
Meadview: Road grading on (1) Mead Dr. from King Tut Dr. to Campanile Dr., (2) King Tut Dr. from Pierce Ferry Rd. to Mead Dr., (3) Crescent Dr. from Mead Dr. to Sandy Point Dr. and (4) Driftwood Dr. from Crescent Dr. to Campanile Dr. Also, crews will be repairing pot holes and making road shoulder repairs on (1) Galloway Dr. from Sandy Point Dr. to Escalante Blvd. and (2) Stanton Dr. from Sandy Point Dr. to Escalante Blvd.
Lake Havasu: Crews will be crack sealing in the Lake Ridge Estates area.
Mohave Valley: Road grading in the Lagoon Estates area. Street sweeping in the Desert Lakes Estates area of Mohave Valley and in the Davis Camp area near Bullhead City.
Heavy Road Maintenance Projects:
Pierce Ferry Rd. Widening: Thermoplastic pavement markings will be installed the week of November 4, 2020.
Vanderslice Rd.: From the MCSO substation for one mile north (North of Reservation Rd.)—June 8 through November, 2020—CEMEX: One mile of concrete pavement.